Project requirements
- Install exterior connections and ensure waterproofing during stacking for three supportive housing units at 3 jobsites – Inglewood (12312 112 Ave NW), McArthur (14125 136a Ave NW), and Terrace Heights (6210 Terrace Rd NW).
- Install interior connections in hallways and suites.
Equipment used: Crane, rig & set all modular units onto concrete structure at 3 separate jobsites (Main build by Delnor Construction / Modulars built by Northgate Industries)